Monday, October 10, 2016

Slow But Steady Progress

    I have been making some advances on the interior. I have also been working a little on the exterior. Though undocumented, I have repainted the tongue and installed a new jack. She also sports a new aluminum propane tank and custom mounting bracket. The rear bumper has also been beefed up and painted.

A huge milestone was reached over the Labor Day weekend: I pulled it out of the garage onto the driveway and slept in it for two nights!

Closet on right is roughed in.
Have yet to make the window/screen frames.
The curtain material is only temporarily pinned up. 
This is the material I have chosen to make the curtains from. Have yet to make them since I don't know how to sew!
Working on the cabinet front and drawers now.
I still need to finish trimming out the floor.
The counter top and table will be laminated in turquoise.
New vinyl cushions are being made by my upholstery shop as we speak.
She was far enough along to camp for two nights in the driveway. Bonfire and all!