Monday, February 29, 2016

Vinyl Flooring

    I got the new vinyl floor installed over the weekend with the help of Tony Otis. The wiring is now roughed in too. Now it is time to insulate!


Friday, February 26, 2016

Framing Completed

    I have completed re-building the interior framing for the rear of the trailer. I also had to repair a portion of the left front as well. Time to get the wiring roughed in!

Rear

Rather than try to duplicate the intricate original framing, I elected to use 3/4" OSB.

The OSB plywood will be much stronger and self insulating.

Front corner repair. Note original framing method.

Front

Wednesday, February 24, 2016

Wheels and Tires

    After finishing up the spare, I moved on to the other wheels. With these now done, its time to head back inside and complete the new framing.

Was lucky to have made it 200 miles on these!

Before

After


Monday, February 22, 2016

The Original Spare

    I took a break from woodworking and cleaned up the original spare tire and wheel which had never been used. I then bought a new bracket and mounted it on the tongue.



Dayton Thoroughbred.


Wednesday, February 10, 2016

New Sub Floor

3/4" pressure treated plywood. That should be good for the next 56 years! 

The Project Supervisor has assumed his regular position.











Wednesday, February 3, 2016

Demolition Day..... or Week



Yuk!


Asbestos I'm sure.


Factory installed ice box support.













Can't wait to get this thing off!
                                         
Good riddance!



Gutting Complete!

Friday, January 22, 2016

Inspection Time

    Once home and with the trailer in the garage, it was time to assess the condition of the interior. As expected, there is a lot of water damage in the rear. At least all the parts are there, which will make duplicating everything much easier. I documented everything and took plenty of measurements and pictures. Needless to say, the complete demolition shall commence immediately!

OK, well at least everything is still there.









The stove and ice box should clean up nicely.

The front is fairly dry.

The original unused spare!


Hmmm.... What a nice storage cabinet.

Not. Surprise!